Have you ever wondered how steel buildings are forged? The practice is equally complex and accurate. The production of steel construction is a wonderful combination of technology, craftsmanship, creativity, teamwork, know-how and manufacturing experience of metal construction. Hama Steel is the winning team running with the desire to be a world-class producer of bars again. Every construction gets a lot of attention and care during the manufacturing process, is made by experienced craftsmen and finished with inspection by a committed team of professionals. Precision engineering, machines and components and exceptional excellent management achieve high quality commercial product with precision.

After a customer buys a pre-engineered steel metal or building construction system, their earner, who performs several roles of construction consultant, building contractor, tech and estimator, carries out the buyer's order in a steel construction factory. At the top metal construction factories, the mill makes all the essential building components of the house itself. This way, all the components are compatible and move smoothly with the work in which there is no start and the components don’t wait to get there from other providers.


In a steel building factory, the order entry section is completed at the beginning of the purchase, by the time the order is received before sending the steel construction. Engineers of pre-engineered steel buildings are responsible for the optimization of their steel construction, each engineer is certified by the country where the construction will be assembled. Building details such as snow and wind loads and seismic data are entered into the innovative metal construction software software application that creates engineering shop drawings for framing your construction in addition to some other drawings required for building construction and production.


Pre-engineered steel construction engineers at metal construction mills inspect construction drawings and inspect buy orders for accuracy. Permit drawings are made that can be employed for the safety of the building permit. Construction of actual construction CNC. (Computer Numerical Control) The construction of machines begins with the input of specifications, which require the use of a computer to control machines programmed using CNC machining language (G-code). CNC Machines control all machine features, including speed and feeds.



Steel structure components, such as I-beams, gutters and downspouts, sidewalls and end wall panels, as well as standing seam roofs are made in clear regions known as "lines" by metallic construction mills. Since every steel construction is done to order, the necessary construction components are made to meet the specific specifications of each steel building.


Production of metal structures rafters and cummins begins with a plasma table. The net leads to the holding station where the flange will be net welded, waiting for the maneuver by an automatic conveyor in the channel. The flange machine also cuts the flanges to a specified length based on pre-determined specifications of engineering outside the steel-bar stock. After cutting, the flanges proceed to the holding station waiting to be channeled through the automatic conveyor, where the flanges will be sold to the mesh before leaving the automatic welding machine.


Goes to your PHI machine via a tacked rafter and cummins conveyor. In a PHI machine, the automatic welding process fuses the internet and flange objects, welding the flanges permanently in the internet. Roof and sidewalk panels are made from metal sheeting. The straight sheet is cut and passed through a roster before providing a straight sheet which is a form of roofing or sidewall sheeting. Like all machines in a steel building factory, the computer feeds data into a metallic corrugated machine that provides specifications for each construction.


The complex machines on the trim line simplify the process by which the habit trim is shaped and guarantees precise curves and ideal angles. Outside the yard, the staging department collects all components of the steel construction and carefully fills the work website into the truck to provide construction. Particular attention is paid to the bill of materials to ensure that each order is accurate and complete. Traffic Office Fees manages the direction of arranging buildings for each construction, schedule truck, and timely arrival at the workplace with an endocrine team awaiting delivery.